Contract Division Ongoing Projects

      

Project as a contractor
1. Institutional College Building, Akluj, Solapur.

Construction of Engineering College Building for Shankarrao
Mohite Patil Hospital Charitable trust, at Akluj Dist. Solapur.
Project Cost = Rs. 8.25 Crore
Construction Area = 99500 Sft.
Project Duration = 8 months.

2. Workshop, Canteen, Girl's Hostel, Boy's Hostel, & Staff Quarters Buildings at Akluj, Solapur.
Construction of workshop, Canteen, Girl's & Boy's Hostel & Staff
Quarter Building Engineering College Building for Shankarrao
Mohite Patil Hospital Charitable trust, at Akluj Dist. Solapur.
Project Cost = Rs. 5.35 Crore
Construction Area = 66500 Sft.
Project Duration = 6 months.

3. Staff Quarters Buildings at Lavel, Chiplun.

Construction of Staff Quarters Building for Gharda Institutional
Foundation at Lavel, Chiplun.
Project Cost = Rs. 1.05 Crore
Construction Area = 11500 Sft.
Project Duration = 8 months.

4. B & C wing Buildings at Lonawala, Pune.

Construction of B & C Buildings for Manashakti Kendra,Lonawala, Pune.
Project Cost = Rs. 1.75 Crore
Construction Area = 14500 Sft.
Project Duration = 8 months.

5. Commercial Bank Building, Pandharpur, Solapur.

Construction of Commercial Bank Building for
The Pandharpur Urban Co-Op Bank Ltd. Pandharpur, Dist. Solapur.
Project Cost = Rs. 1.35 Crore
Construction Area = 10500 Sft.
Project Duration = 8 months.

  Copyright Krishna Constro-Projects Private Limited. All rights reserved.      
  Home  |   About Us  |   Career Openings  |   Contact Us  |   Disclaimer  |   Privacy Policy  |   Sitemap Powered by Cloudmatic